تنصيب ۽ ٽيسٽ مشين لاءِ ٿلهو قسم شاٽ بلاسٽنگ مشين جي احتياطي تدبيرون.
- 2021-06-03-
جيٿلهو قسم شاٽ blasting مشينعام طور تي ھڪڙو وڏو ظاھر آھي ، ۽ انسٽاليشن وارو عمل نسبتا و complicatedيڪ پيچيده آھي نن smallن سامان جي يٽ ۾. صحيح تنصيب ۽ ٽيسٽ مشين آهن ڪنجي کي يقيني بڻائڻ جي عام آپريشن بعد جي سامان جي. غير ماهر ابتدائي عملن جي صورت ۾ ، استعمال ڪندڙن کي گھرجي ته سختي سان لا personnelاپيل عملدارن جي هدايتن تي عمل ڪن يا هدايتن جو حوالو ڏين. غير مجاز آپريشن آساني سان ڪري سگھي ٿو ناقابل واپسي نقصان کيٿلهو shotماڪي واري مشين. جيshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. جيٿلهو قسم شاٽ blasting مشين is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. جيprecautions for the installation and debugging of the relevant components are introduced below.
1. شاٽ بلاسٽنگ ڊيوائس:
جيshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Hoist ۽ ارارت conveyor:
پھريائين ھڪڙو لوڊ لوڊ نه ڪريو جانچ ڪرڻ لاءِ ته hoا لھرائڻ واري بالٽي ۽ سرپل بليڊ صحيح رستي تي ھلندا آھن ، پوءِ لistڻ جي پٽي کي وچولي درجي جي تنقيد سان تنگ ڪيو و devي انحراف کان بچڻ لاءِ ، ۽ پوءِ چيڪ ڪريو لوڊ ٽيسٽ. آپريشن ۽ پهچائڻ جي گنجائش ، thereا اتي ڪو عجيب شور ۽ کمپن آھي ، چيڪ ڪريو ۽ رڪاوٽون ختم ڪريو.
.
پھريائين جانچيو ته mا رام جي حرڪت لچڪدار آھي ، ۽ پوءِ sepaار ڪرڻ واري پليٽ جي مناسب پوزيشن چيڪ ڪريو ، پوءِ جڏھن لistل ھوندو ۽ ڊيبگ ڪيو ويو ، اتي اسٽيل شاٽس جي مسلسل آمد آھي ، ۽ چيڪ ڪريو ته اسٽيل جا شاٽ flowingاھر و andي رھيا آھن ۽ گرندا. جڏھن uteاھر نڪرندو آھي